Skip to main content

Parametric Study of Front-End Nuclear Fuel Cycle Costs Using Reprocessed Uranium

This study evaluates front-end nuclear fuel cycle costs assuming that uranium recovered during the reprocessing of commercial light-water reactor (LWR) spent nuclear fuel is available to be recycled and used in the place of natural uranium. This report explores the relationship between the costs associated with using a natural uranium fuel cycle, in which reprocessed uranium (RepU) is not recycled, with those associated with using RepU.

Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.