Skip to main content

Parametric Study of Front-End Nuclear Fuel Cycle Costs Using Reprocessed Uranium

Author(s)
Electric Power Research Institute
Publication Date

Abstract

This study evaluates front-end nuclear fuel cycle costs assuming that uranium recovered during the reprocessing of commercial light-water reactor (LWR) spent nuclear fuel is available to be recycled and used in the place of natural uranium. This report explores the relationship between the costs associated with using a natural uranium fuel cycle, in which reprocessed uranium (RepU) is not recycled, with those associated with using RepU.