Transportation and Storage Subcommittee Report to the Full Commission DRAFT

The main question before the Transportation and Storage Subcommittee was whether the United States
should change its approach to storing and transporting spent nuclear fuel (SNF) and high-level
radioactive waste (HLW) while one or more permanent disposal facilities are established.
To answer this question and to develop specific recommendations and options for consideration by the
full Commission, the Subcommittee held multiple meetings and deliberative sessions, visited several

Review of Information for Spent Nuclear Fuel Burnup Confirmation

The Interim Staff Guidance on burnup credit (ISG-8, revision 2) for pressurized-water-reactor spent
nuclear fuel in storage and transport casks, issued in 2002 by the U.S. Nuclear Regulatory Commission’s
Spent Fuel Project Office, recommends an out-of-core burnup measurement to confirm the reactor record
and compliance with the assembly burnup value used for cask loading acceptance. This recommendation
is intended to prevent unauthorized loading (i.e., misloading) of assemblies due to inaccuracies in reactor

Blue Ribbon Commission on America’s Nuclear Future Draft Report to the Secretary of Energy

America’s nuclear waste management program is at an impasse. The Obama Administration’s decision
to halt work on a repository at Yucca Mountain in Nevada is but the latest indicator of a policy that has
been troubled for decades and has now all but completely broken down. The approach laid out under
the 1987 Amendments to the Nuclear Waste Policy Act (NWPA)—which tied the entire U.S. high-level
waste management program to the fate of the Yucca Mountain site—has not worked to produce a

The Potential of Using Commercial Dual Purpose Canisters for Direct Disposal

This report evaluates the potential for directly disposing of licensed commercial Dual Purpose
Canisters (DPCs) inside waste package overpacks without reopening. The evaluation considers
the principal features of the DPC designs that have been licensed by the Nuclear Regulatory
Commission (NRC) as these relate to thedesigns of waste packages and as they relate to
disposability in a repository in unsaturated volcanic tuff. Where DPC features appear to compromise future disposability in an unsaturated tuff (e.g., Yucca Mountain) repository

Total System Model Version 6.0 Transportation Design and Bases

The Civilian Radioactive Waste Management System (CRWMS) Total System Model (TSM) is
a planning tool that estimates the logistic and cost impacts of various operational assumptions in
accepting radioactive wastes. Waste forms currently tracked are commercial spent nuclear fuel
(CSNF), Department of Energy (DOE) Spent Nuclear Fuel (DOE SNF), and High-Level
(radioactive) Waste (HLW). The TSM and associated programs analyze and simulate the actions
for waste acceptance from discharge until emplacement.

Letter to President Obama - Blue Ribbon Commission

Dear Mr. President:
At your direction, the Secretary of Energy established the Blue Ribbon Commission on
America’s Nuclear Future to review policies for managing the back end of the nuclear
fuel cycle and recommend a new strategy. We are pleased to be serving as Co‐
Chairmen of the Commission, and we are writing to you to highlight an important action
we strongly believe should be reflected in your Fiscal Year 2013 baseline budget
projections.
In our draft report to the Secretary, issued in July of this year, the Commission

Letter from the BRC to the Members of the South Carolina Congressional Delegation

Dear Members of the South Carolina Congressional Delegation:
Thank you all for your letter of October 27th. We appreciate hearing your views on the
Yucca Mountain project, the safety benefits of deep geologic disposal, and the
importance of the retaining the H Canyon facility at the Department of Energy’s
Savannah River Site.
In our draft report, the Commission finds that deep geologic disposal is an essential
component of a comprehensive nuclear waste management system. Your comments

Isotopic Analysis of High-Burnup PWR Spent Fuel Samples from the Takahama-3 Reactor

This report presents the results of computer code benchmark simulations against spent fuel radiochemical assay
measurements from the Kansai Electric Ltd. Takahama-3 reactor published by the Japan Atomic Energy
Research Institute. Takahama-3 is a pressurized-water reactor that operates with a 17 × 17 fuel-assembly design.
Spent fuel samples were obtained from assemblies operated for 2 and 3 cycles and achieved a maximum burnup
of 47 GWd/MTU. Radiochemical analyses were performed on two rods having an initial enrichment of

SCALE-4 Analysis of Pressurized Water Reactor Critical Configurations: Volume 3-Surry Unit 1 Cycle 2

The requirements of ANSI/ANS 8.1 specify that calculational methods for away-from-reactor criticality safety analyses be validated against experimental measurements. If credit for the negative reactivity of the depleted (or spent) fuel isotopics is desired, it is necessary to benchmark computational methods against spent fuel critical configurations.
Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.