Skip to main content

Implementation of the Resource Disincentive in 40 CFR Part 191.14(e) at the Waste Isolation Pilot Plant

In 1986, the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project<br/>Office (WPO) (DOE-WPO) prepared a strategy _ for complying with the Environmental<br/>Protection Agency&#39;s (EPA&#39;s) Standards for the management of transuranic (TRU) waste. 2<br/>Section 3.2.2.2 of the DOE&#39;s report addressed compliance with the Assurance<br/>Requirements found in 40 CFR ยง 191.143 . One of the Assurance Requirements addresses<br/>the selection of repository sites that contain recoverable natural resources.

Disclaimer: Note that this page contains links to external sites. When leaving the CURIE site, please note that the U.S. Department of Energy and Pacific Northwest National Laboratory do not control or endorse the content or ads on these sites.