Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Country
Keywords
Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites
Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites
This report discusses the status of the commercial spent nuclear fuel (SNF) inventory in the United States, at both decommissioned and operating commercial nuclear power reactor sites; summarizes the contractual arrangement the government and utilities have under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961) (Standard Contract), related litigation, and the financial liabilities resulting from the Department’s delay in performance under these contracts; provides a history of interim storage policy as it relates to commercial SN
Advanced Fuel Cycle Cost Basis
Advanced Fuel Cycle Cost Basis
This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models.
Spent Nuclear Fuel: Accumulating Quantities at Commercial Reactors Present Storage and Other Challenges
Spent Nuclear Fuel: Accumulating Quantities at Commercial Reactors Present Storage and Other Challenges
The amount of spent fuel stored on-site at commercial nuclear reactors will continue to accumulate—increasing by about 2,000 metric tons per year and likely more than doubling to about 140,000 metric tons—before it can be moved off-site, because storage or disposal facilities may take decades to develop. In examining centralized storage or permanent disposal options, GAO found that new facilities may take from 15 to 40 years before they are ready to begin accepting spent fuel. Once an off-site facility is available, it will take several more decades to ship spent fuel to that facility.
Evaluation of Burnup Credit for Accommodating PWR Spent Nuclear Fuel in High-capacity Cask Designs
Evaluation of Burnup Credit for Accommodating PWR Spent Nuclear Fuel in High-capacity Cask Designs
This paper presents an evaluation of the amount of burnup credit needed for high-density casks to
transport the current U.S. inventory of commercial spent nuclear fuel (SNF) assemblies. A prototypic
32-assembly cask and the current regulatory guidance were used as bases for this evaluation.
By comparing actual pressurized-water-reactor (PWR) discharge data (i.e., fuel burnup and initial
enrichment specifications for fuel assemblies discharged from U.S. PWRs) with actinide-only-based
Identifying remaining socio-technical challenges at the national level: Slovenia
Identifying remaining socio-technical challenges at the national level: Slovenia
The use of nuclear energy has a strong tradition in Slovenia. In 1949 the Institute Josef Stefan was founded, devoted to research in physics, with great emphasis on nuclear physics. A few years later (1966) the research nuclear reactor TRIGA started to work in the vicinity of capital city Ljubljana, to support its research.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Schreiber
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Schreiber
On September 28, 2010, the Township of Schreiber expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the Schreiber area against five screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of White River
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of White River
On April 11, 2012 the Township of White River expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the White River area against five initial screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Nipigon
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Nipigon
On November 9, 2011, the Township of Nipigon expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel ( NWMO, 2010). This report presents the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the Nipigon area against five initial screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Ear Falls, Ontario
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Ear Falls, Ontario
On August 26, 2010, the Township of Ear Falls expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the Ear Falls area against five screening criteria using readily available information.
Monitored Retrievable Storage Project Plan
Monitored Retrievable Storage Project Plan
The purpose of this document is to describe the Monitored Retrievable Storage (MRS) Project and to establish approved cost and schedule baselines against which overall progress and management effectiveness shall be measured. For the sake of brevity, this Project Plan will be referred to as the Plan throughout this document.
Fast Flux Test Facility (FFTF) Reactor Fuel Criticality Calculations
Fast Flux Test Facility (FFTF) Reactor Fuel Criticality Calculations
The purpose of these calculations is to characterize the criticality safety concerns for the storage of Fast Flux Test Facility (FFTF) nuclear fuel in a Department of Energy spent nuclear fuel (DOE SNF) canister in a co-disposal waste package. These results will be used to support the analysis that will be done to demonstrate concept viability related to use in the Monitored Geologic Repository (MGR) environment.
FEDERAL COMMITMENTS REGARDING USED FUEL AND HIGH-LEVEL WASTES
FEDERAL COMMITMENTS REGARDING USED FUEL AND HIGH-LEVEL WASTES
Alternative Means of Financing and Managing the Civilian Radioactive Waste Management Program
Alternative Means of Financing and Managing the Civilian Radioactive Waste Management Program
This report is in response to the directive of the House Appropriations Subcommittee for Energy and Water
Development that the Department of Energy (DOE) update a 1984 report of alternative means of financing and
managing (AMFM) the Office of Civilian Radioactive Waste Management (OCRWM) in the DOE. The
President’s FY 2002 budget also stated: “DOE will submit to Congress an updated report regarding alternative
approaches to finance and manage the program by June 30, 2001[.] DOE will identify in this report models of
Description of Fracture Systems for External Criticality Reports
Description of Fracture Systems for External Criticality Reports
The purpose of this Analysis/Model Report (AMR) is to describe probabilistically the main features of the geometry of the fracture system in the vicinity of the repository. They will be used to determine the quantity of fissile material that could accumulate in the fractured rock underneath a waste package as it degrades. This AMR is to feed the geochemical calculations for external criticality reports. This AMR is done in accordance with the technical work plan (BSC (Bechtel SAIC Company) 2001 b). The scope of this AMR is restricted to the relevant parameters of the fracture system.
slides - Canister Confinement Integrity, Integrated Plan for Addressing Potential Chloride-Induced Stress Corrosion Cracking of Austenitic Stainless Steel Dry Cask Storage System Canisters
slides - Canister Confinement Integrity, Integrated Plan for Addressing Potential Chloride-Induced Stress Corrosion Cracking of Austenitic Stainless Steel Dry Cask Storage System Canisters
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
Waste Acceptance System Requirements Document, Revision 5, ICN 01
Waste Acceptance System Requirements Document, Revision 5, ICN 01
The purpose of this document is to establish waste acceptance technical requirements for the U.S. Department of Energy’s (DOE) Civilian Radioactive Waste Management System (CRWMS). These requirements and functions consist of two types: (a) internal CRWMS requirements derived from the Civilian Radioactive Waste Management System Requirements Document (CRD) (DOE 2007a) as illustrated in Figure 1, and (b) acceptance criteria imposed by the CRWMS on spent nuclear fuel (SNF) and high-level waste (HLW) delivered into the CRWMS.
Operational Waste Stream Assumption for TSLCC Estimates
Operational Waste Stream Assumption for TSLCC Estimates
This document provides the background and basis for the operational waste stream used in the 2000 Total System Life Cycle Cost (TSLCC) estimate for the Civilian Radioactive Waste Management System (CRWMS). This document has been developed in accordance with its Development Plan (CRWMS M&O 2000a), and AP-3.11Q, ''Technical Reports''.
Report on Radioactive Waste Ownership and Management of Long-Term Liabilities in EDRAM Member Countries
Report on Radioactive Waste Ownership and Management of Long-Term Liabilities in EDRAM Member Countries
This report has been prepared by an ad-hoc Working Group (WG) formed by ANDRA (France), NUMO (Japan), NAGRA (Switzerland) and ENRESA (Spain) in May 2003, after the EDRAM meeting held in Valencia to study the situation in the different EDRAM member countries regarding the treatment of radioactive waste ownership and management of long-term liabilities.
Program of Research and Development for Management and Disposal of Commercially Generated Radioactive Wastes: Record of Decision
Program of Research and Development for Management and Disposal of Commercially Generated Radioactive Wastes: Record of Decision
This Record of Decision has been prepared pursuant to the Regulations of
the council on Environmental Quality, 40 CFR Part 1805, on the selection of a
strategy for the disposal of commercially-generated radioactive wastes and the
supporting program of research and development.
The United States Department of Energy has decided to (1) adopt a strategy to
develop mined geologic repositories for disposal of commercially-generated
high-level and transuranic radioactive wastes (while continuing to examine
One Step at a Time: The Staged Development of Geologic Repositories for High-Level Radioactive Waste - Summary
One Step at a Time: The Staged Development of Geologic Repositories for High-Level Radioactive Waste - Summary
A new report from the National Academies proposes a management approach called “adaptive staging” as a promising means to develop geologic repositories for high-level waste such as the proposed repository at Yucca Mountain, Nevada. Adaptive staging is a learn-as-you-go process that enables project managers to continuously reevaluate and adjust the program in response to new knowledge and stakeholder input.
Radioactive Waste Repository Licensing, Synopsis of a Symposium, Executive Summary
Radioactive Waste Repository Licensing, Synopsis of a Symposium, Executive Summary
This book recounts the issues raised and the viewpoints aired at a recent symposium on
repository licensing. It summarizes the problems surrounding the setting of an
Environmental Protection Agency standard for the release of radionuclides and the
regulatory problems inherent in meeting such a standard. Symposium participants came
from a variety of federal agencies and advisory groups, state governments, public interest
groups, engineering firms, national laboratories, and foreign and international
organizations.
Direct Radiation Dose Consequence Calculation for Category 1 and 2 Event Sequences
Direct Radiation Dose Consequence Calculation for Category 1 and 2 Event Sequences
Performance objectives for the geologic repository operations area through permanent closure in 10 CFR 63.111 identify compliance with regulatory dose limits for workers and members of the public as a design objective. The purpose of this design calculation is to determine direct radiation dose consequences for Category 1 and 2 event sequences. It does not include worker dose assessment for recovery operations following Category 1 event sequences.
Safety Evaluation of a Geological Repository
Safety Evaluation of a Geological Repository
The Law of 30 December 1991 [1] confers to Andra the mission of assessing the feasibility of a repository of high-level and long-lived (HLLL) waste in a deep geological formation.