Selecting the Site: The Final Disposal at Olkiluoto
Selecting the Site: The Final Disposal at Olkiluoto
Posiva webpage discussing selecting the site for final disposal of spent fuel.
Posiva webpage discussing selecting the site for final disposal of spent fuel.
A summary of nuclear waste management in Finland, including energy use statistics, principles of nuclear waste management, financing, how waste is disposed of, the underground research laboratory, and the authorities involved in nuclear waste management.
This report discusses the status of the commercial spent nuclear fuel (SNF) inventory in the United States, at both decommissioned and operating commercial nuclear power reactor sites; summarizes the contractual arrangement the government and utilities have under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961) (Standard Contract), related litigation, and the financial liabilities resulting from the Department’s delay in performance under these contracts; provides a history of interim storage policy as it relates to commercial SN
This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models.
The amount of spent fuel stored on-site at commercial nuclear reactors will continue to accumulate—increasing by about 2,000 metric tons per year and likely more than doubling to about 140,000 metric tons—before it can be moved off-site, because storage or disposal facilities may take decades to develop. In examining centralized storage or permanent disposal options, GAO found that new facilities may take from 15 to 40 years before they are ready to begin accepting spent fuel. Once an off-site facility is available, it will take several more decades to ship spent fuel to that facility.
This paper presents an evaluation of the amount of burnup credit needed for high-density casks to
transport the current U.S. inventory of commercial spent nuclear fuel (SNF) assemblies. A prototypic
32-assembly cask and the current regulatory guidance were used as bases for this evaluation.
By comparing actual pressurized-water-reactor (PWR) discharge data (i.e., fuel burnup and initial
enrichment specifications for fuel assemblies discharged from U.S. PWRs) with actinide-only-based
In an international perspective, Sweden has come a long way in the development of safe and accepted systems for the management and disposal of radioactive waste. <br/><br/>A complete system for sea transport of spent nuclear fuel from the twelve Swedish nuclear reactors has been in operation since 1982. The spent nuclear fuel will be stored in CLAB for a period of about 40 years up until final disposal. The facility has been in operation since 1985. A final repository for low- and intermediate-level short-lived waste, SFR, has been in operation since April 1988.
The preceding RD&D-Programme from 2001 was concentrated on research and technology development. Research with a focus on the assessment of long-term safety was emphasized and viewpoints from previous reviews of SR 97 and RD&D-Programme 98 were dealt with in depth. SR 97 was an assessment of the long-term safety of a deep repository for spent nuclear fuel. This RD&D-Programme 2004 focuses its attention on the development of technologies for fabrication and sealing of canisters for final disposal of spent fuel.
The purpose of this document is to describe the Monitored Retrievable Storage (MRS) Project and to establish approved cost and schedule baselines against which overall progress and management effectiveness shall be measured. For the sake of brevity, this Project Plan will be referred to as the Plan throughout this document.
The purpose of these calculations is to characterize the criticality safety concerns for the storage of Fast Flux Test Facility (FFTF) nuclear fuel in a Department of Energy spent nuclear fuel (DOE SNF) canister in a co-disposal waste package. These results will be used to support the analysis that will be done to demonstrate concept viability related to use in the Monitored Geologic Repository (MGR) environment.
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
The purpose of this document is to establish waste acceptance technical requirements for the U.S. Department of Energy’s (DOE) Civilian Radioactive Waste Management System (CRWMS). These requirements and functions consist of two types: (a) internal CRWMS requirements derived from the Civilian Radioactive Waste Management System Requirements Document (CRD) (DOE 2007a) as illustrated in Figure 1, and (b) acceptance criteria imposed by the CRWMS on spent nuclear fuel (SNF) and high-level waste (HLW) delivered into the CRWMS.
This report has been prepared by an ad-hoc Working Group (WG) formed by ANDRA (France), NUMO (Japan), NAGRA (Switzerland) and ENRESA (Spain) in May 2003, after the EDRAM meeting held in Valencia to study the situation in the different EDRAM member countries regarding the treatment of radioactive waste ownership and management of long-term liabilities.
This Record of Decision has been prepared pursuant to the Regulations of
the council on Environmental Quality, 40 CFR Part 1805, on the selection of a
strategy for the disposal of commercially-generated radioactive wastes and the
supporting program of research and development.
The United States Department of Energy has decided to (1) adopt a strategy to
develop mined geologic repositories for disposal of commercially-generated
high-level and transuranic radioactive wastes (while continuing to examine
A new report from the National Academies proposes a management approach called “adaptive staging” as a promising means to develop geologic repositories for high-level waste such as the proposed repository at Yucca Mountain, Nevada. Adaptive staging is a learn-as-you-go process that enables project managers to continuously reevaluate and adjust the program in response to new knowledge and stakeholder input.
This book recounts the issues raised and the viewpoints aired at a recent symposium on
repository licensing. It summarizes the problems surrounding the setting of an
Environmental Protection Agency standard for the release of radionuclides and the
regulatory problems inherent in meeting such a standard. Symposium participants came
from a variety of federal agencies and advisory groups, state governments, public interest
groups, engineering firms, national laboratories, and foreign and international
organizations.
Performance objectives for the geologic repository operations area through permanent closure in 10 CFR 63.111 identify compliance with regulatory dose limits for workers and members of the public as a design objective. The purpose of this design calculation is to determine direct radiation dose consequences for Category 1 and 2 event sequences. It does not include worker dose assessment for recovery operations following Category 1 event sequences.
The AMFM Panel has submitted its report "Managing Nuclear
Waste - A Better Idea" to the Secretary. The report contains six
general conclusions and one general recommendation in Chapter
XII. In addition, Chapter X contains 14 specific enhancements
("Key Components of Any Waste Management Structure") that are
recommended for implementation by the Office of Civilian Radioactive
Waste Management (OCRWM) or any alternative organization.
This paper lists and discusses the 6 general conclusions, the
The Law of 30 December 1991 [1] confers to Andra the mission of assessing the feasibility of a repository of high-level and long-lived (HLLL) waste in a deep geological formation.