Technical Evaluation Report on the Content of the U.S. Department of Energy's Yucca Mountain Repository License Application
Technical Evaluation Report on the Content of the U.S. Department of Energy's Yucca Mountain Repository License Application
This “Technical Evaluation Report on the Content of the U.S. Department of Energy’s Yucca Mountain License Application; Postclosure Volume: Repository Safety After Permanent Closure” (TER Postclosure Volume) presents information on the NRC staff’s review of DOE’s Safety Analysis Report (SAR), provided on June 3, 2008, as updated by DOE on February 19, 2009. The NRC staff also reviewed information DOE provided in response to NRC staff’s requests for additional information and other information that DOE provided related to the SAR.
slides - Cumulative Impact of Industry and NRC Actions
slides - Cumulative Impact of Industry and NRC Actions
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
NRC/NEI, January 24, 2014 Public Meeting Presentations
NRC/NEI, January 24, 2014 Public Meeting Presentations
NRC/NEI, January 24, 2014 Public Meeting Presentations
Slides - Retrievability, Cladding Integrity, and Safety Handling during Storage and Transportation
Slides - Retrievability, Cladding Integrity, and Safety Handling during Storage and Transportation
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV—Lessons Learned
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV—Lessons Learned
The effective termination of the Yucca Mountain program by the U.S. Administration in 2009
has further delayed the construction and operation of a permanent disposal facility for used fuel
and high level radioactive waste (HLW) in the United States. In concert with this decision, the
President directed the Energy Secretary to establish the Blue Ribbon Commission on America’s
Nuclear Future to review and provide recommendations on options for managing used fuel and
NRC Waste Confidence Rulemaking, Federal Register, 1984, 1990, 1999, and 2008
NRC Waste Confidence Rulemaking, Federal Register, 1984, 1990, 1999, and 2008
NRC Waste Confidence Rulemaking, Federal Register, 1984, 1990, 1999, and 2008
Directory of Certificates of Compliance for Radioactive Materials Packages (NUREG-0383)
Directory of Certificates of Compliance for Radioactive Materials Packages (NUREG-0383)
The purpose of this directory is to make available a convenient source of information on package designs approved by the U.S. Nuclear Regulatory Commission. To assist in identifying packages, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volume 2. The report includes all package designs approved prior to the publication date of the directory as of September 2013.
Transportation of Commercial Spent Nuclear Fuel Regulatory Issues Resolution
Transportation of Commercial Spent Nuclear Fuel Regulatory Issues Resolution
The U.S. industry’s limited efforts at licensing transportation packages characterized as “highcapacity,”
or containing “high-burnup” (>45 GWd/MTU) commercial spent nuclear fuel
(CSNF), or both, have not been successful considering existing spent-fuel inventories that will
have to be eventually transported. A holistic framework is proposed for resolving several CSNF
transportation issues. The framework considers transportation risks, spent-fuel and cask-design
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned
The effective termination of the Yucca Mountain program by the U.S. Administration in 2009 has further delayed the construction and operation of a permanent disposal facility for used fuel and high level radioactive waste (HLW) in the United States. In concert with this decision, the President directed the Energy Secretary to establish the Blue Ribbon Commission on America's Nuclear Future to review and provide recommendations on options for managing used fuel and HLW.
Yucca Mountain Licensing Standard Options for Very Long Time Frames: Technical Bases for the Standard and Compliance Assessments
Yucca Mountain Licensing Standard Options for Very Long Time Frames: Technical Bases for the Standard and Compliance Assessments
In the existing U.S. Environmental Protection Agency (EPA) and Nuclear Regulatory Commission (NRC) regulations governing the spent nuclear fuel and high-level radioactive waste site at Yucca Mountain, Nevada, the time period of compliance was set at 10,000 years. Recently, a Court ordered that EPA and NRC either revise the regulation on this topic to be "based upon and consistent with" recommendations made by a panel of the National Academy of Sciences, who recommended a time period of compliance out to as long as one million years, or seek congressional relief.
Overview of the Nuclear Regulatory Commission and Its Regulatory Process for the Nuclear Fuel Cycle for Light Water Reactors
Overview of the Nuclear Regulatory Commission and Its Regulatory Process for the Nuclear Fuel Cycle for Light Water Reactors
This paper provides a brief description of the United States Nuclear Regulatory Commission (NRC) and its regulatory process for the current nuclear fuel cycle for light water power reactors (LWRs). It focuses on the regulatory framework for the licensing of facilities in the fuel cycle. The first part of the paper provides an overview of the NRC and its regulatory program including a description of its organization, function, authority, and responsibilities.
slides - Industry Response to NRC's Request for Comments on Retrievability, Cladding Integrity and 10 CFR 71/72 Alignment
slides - Industry Response to NRC's Request for Comments on Retrievability, Cladding Integrity and 10 CFR 71/72 Alignment
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
slides - Generic Communications and Guidance on Spent Fuel Storage & Transportation
slides - Generic Communications and Guidance on Spent Fuel Storage & Transportation
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
U.S. Regulatory Recommendations for Actinide-Only Burnup Credit in Transport and Storage Casks
U.S. Regulatory Recommendations for Actinide-Only Burnup Credit in Transport and Storage Casks
In July 1999, the U.S. Nuclear Regulatory Commission (NRC) Spent Fuel Project Office
(SFPO) issued Interim Staff Guidance 8 Revision 1 (ISG8R1) to provide recommendations for the use
of burnup credit in storage and transport of pressurized-water reactor (PWR) spent fuel. Subsequent to
the issuance of ISG8R1, the NRC Office of Regulatory Research (RES) has directed an effort to
investigate the technical basis for extending the criteria and recommendations of ISG8R1 to allow
Geological Disposal of Radioactive Waste
Geological Disposal of Radioactive Waste
The objective of this safety requirements publication is to set down the protection objectives and criteria for geological disposal and to establish the requirements that must be met to ensure the safety of this disposal option, consistent with the established principles of safety for radioactive waste management.
slides - Cumulative Impact of Regulatory Actions Dry Fuel Storage
slides - Cumulative Impact of Regulatory Actions Dry Fuel Storage
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
slides - Vision/Proposed Actions for Regulatory Improvements - Looking to the Future
slides - Vision/Proposed Actions for Regulatory Improvements - Looking to the Future
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
Waste Control Specialists / NRC pre-application public meeting slides
Waste Control Specialists / NRC pre-application public meeting slides
These slides were presented by Waste Control Specialists LLC (WCS) to the NRC at the June 16, 2015 pre-application public meeting at the NRC offices in Rockville, Maryland.
NRC SFST ISG-2: Fuel Retrievability
NRC SFST ISG-2: Fuel Retrievability
This Interim Staff Guidance (ISG) provides guidance to the staff for determining if
storage systems to be licensed under 10 CFR Part 72 allow ready retrieval of spent fuel.
This guidance is not a regulation or a requirement.
NRC ISG-1: Classifying the Condition of Spent Nuclear Fuel for Interim Storage and Transportation Based on Function
NRC ISG-1: Classifying the Condition of Spent Nuclear Fuel for Interim Storage and Transportation Based on Function
This Interim Staff Guidance (ISG) provides guidance to the staff on classifying spent nuclear
fuel as either (1) damaged, (2) undamaged, or (3) intact, before interim storage or
transportation. This is not a regulation or requirement and can be modified or superseded by
an applicant with supportable technical arguments.
Revision 2
NRC SFST ISG-3: Post Accident Recovery and Compliance with 10 CFR 72.122(l)
NRC SFST ISG-3: Post Accident Recovery and Compliance with 10 CFR 72.122(l)
Compliance with 10 CFR 72.122(l) has been interpreted to mean that a licensee, during any
point in the storage cycle, must have a means of retrieving and repackaging individual fuel
assemblies even after an accident. The staff has reevaluated this interpretation.
NRC SFST ISG-4: Cask Closure Weld Inspections
NRC SFST ISG-4: Cask Closure Weld Inspections
The closure weld for the outer cover plate for austenitic stainless steel designs may be
inspected using either volumetric or multiple pass dye penetrant techniques subject to the
following conditions:
• Dye penetrant (PT) examination may only be used in lieu of volumetric
examination only on austenitic stainless steels. PT examination should be done
in accordance with ASME Section V, Article 6, “Liquid Penetrant Examination.”
• For either ultrasonic examination (UT) or PT examination, the minimum
NRC SFST ISG-5: Confinement Evaluation
NRC SFST ISG-5: Confinement Evaluation
Several changes have occurred since the issuance of NUREG-1536, “Standard Review Plan
(SRP) for Dry Cask Storage Systems,” that affect the staff’s approach to confinement
evaluation. The attachment to this ISG integrates the current staff approach into a revision of
ISG-5. The highlights of the changes include:
• Reflects October 1998 revisions to 10 CFR 72.104 and 10 CFR 72.106.
• Expands and clarifies acceptance criteria associated with confinement analysis and
acceptance of “leak tight” testing instead of detailed confinement analysis.
NRC SFST ISG-6: Establishing minimum initial enrichment for the bounding design basis fuel assembly(s)
NRC SFST ISG-6: Establishing minimum initial enrichment for the bounding design basis fuel assembly(s)
The Standard Review Plan, NUREG-1536, Chapter 5, Section V, 2 recommends that “the
applicant calculate the source term on the basis of the fuel that will actually provide the
bounding source term,” and states that the applicant should, “either specify the minimum initial
enrichment or establish the specific source terms as operating controls and limits for cask use.”
A specified source term is difficult for most cask users to determine and for inspectors to verify.