Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Keywords
EQ6 Calculations for Chemical Degradation of PWR LEU and PWR MOX Spent Fuel Waste Packages
EQ6 Calculations for Chemical Degradation of PWR LEU and PWR MOX Spent Fuel Waste Packages
Nuclear Waste Discussion Draft - FLO13341 - 113th Congress - 1st Session
Nuclear Waste Discussion Draft - FLO13341 - 113th Congress - 1st Session
To establish a new organization to manage nuclear waste, provide a consensual process for siting nuclear waste facilities, ensure adequate funding for managing nuclear waste, and for other purposes.
Nuclear Fuel Cycle Cost Comparison Between Once-Through and Plutonium Multi-Recycling in Fast Reactors
Nuclear Fuel Cycle Cost Comparison Between Once-Through and Plutonium Multi-Recycling in Fast Reactors
This report presents results from a parametric study of equilibrium fuel cycle costs for a closed fuel cycle with multi-recycling of plutonium in fast reactors (FRs) compared to an open, once-through fuel cycle using PWRs. The study examines the impact on fuel cycle costs from changes in the unit costs of uranium, advanced PUREX reprocessing of discharged uranium dioxide (UO2) fuel and fast-reactor mixed-oxide (FR-MOX) fuel, and FR-MOX fuel fabrication.
Program on Technology Innovation: Readiness of Existing and New U.S. Reactors for Mixed-Oxide (MOX) Fuel
Program on Technology Innovation: Readiness of Existing and New U.S. Reactors for Mixed-Oxide (MOX) Fuel
Expanding interest in nuclear power and advanced fuel cycles indicate that use of mixed-oxide (MOX) fuel in the current and new U.S. reactor fleet could become an option for utilities in the coming decades. In light of this renewed interest, EPRI has reviewed the substantial knowledge base on MOX fuel irradiation in light water reactors (LWRs). The goal was to evaluate the technical feasibility of MOX fuel use in the U.S. reactor fleet for both existing and advanced LWR designs (Generation III/III+).
Nuclear Fuel Cycle Cost Comparison Between Once-Through and Plutonium Single-Recycling in Pressurized Water Reactors
Nuclear Fuel Cycle Cost Comparison Between Once-Through and Plutonium Single-Recycling in Pressurized Water Reactors
Within the context of long-term waste management and sustainable nuclear fuel supply, there continue to be discussions regarding whether the United States should consider recycling of light-water reactor (LWR) spent nuclear fuel (SNF) for the current fleet of U.S. LWRs. This report presents a parametric study of equilibrium fuel cycle costs for an open fuel cycle without plutonium recycling (once-through) and with plutonium recycling (single-recycling using mixed-oxide, or MOX, fuel), assuming an all-pressurized water reactor (PWR) fleet.
Summary of the Nuclear Waste Administration Act of 2013 Discussion Draft
Summary of the Nuclear Waste Administration Act of 2013 Discussion Draft
The Nuclear Waste Administration Act of 2013 discussion draft is intended to implement the recommendations of the Blue Ribbon Commission on America’s Nuclear Future to establish a nuclear waste administration and create a consent-based process for siting nuclear waste facilities. The bill enables the federal government to fulfill its commitment to managing nuclear waste, ending the costly liability the government bears for its failure to dispose of commercial spent fuel.
Nuclear Waste Bill to Implement the Blue Ribbon Commission's Recommendations Section-by-Section Summary of Discussion Draft - April 2013
Nuclear Waste Bill to Implement the Blue Ribbon Commission's Recommendations Section-by-Section Summary of Discussion Draft - April 2013
In General: The Nuclear Waste Administration Act of 2013 includes most of the language of S.3469, the Nuclear Waste Administration Act of 2012. The most significant change in the 2013 bill is the provision linking construction and siting of a consolidated storage facility to progress on a repository. The 2012 Act prohibited storage of any spent nuclear fuel beyond 10,000 metric tons until the Administration concluded a repository consent agreement.
Nuclear Waste Bill Feedback
Nuclear Waste Bill Feedback
On April 25, 2013, Senators Wyden, Alexander, Feinstein, and Murkowski released a draft bill to create a sustainable, participatory process for managing nuclear waste. The senators requested comments and suggestions on the draft bill, as well as on the alternative language for siting an interim storage facility proposed by Senators Alexander and Feinstein. In addition, the senators posed eight questions on which they sought comments.
Plutonium Fuel: An Assessment Report by an Expert Group
Plutonium Fuel: An Assessment Report by an Expert Group
Ever since the 1950s, plutonium, used in fas reactors, has been seen as the key to unlocking the vast energy resource contained in the the world's uranium reserves. However, the reductions in expected nuclear reactor installation rates, combined with discovery of additional uranium, have led to a lengthening in the perceived time interval before fast reactors, the most effective users of plutonium, will make large demands on plutonium supplies. THere are several options concerning its use or storage in the meantime.
Report On External Criticality of Plutonium Waste Forms In A Geologic Repository
Report On External Criticality of Plutonium Waste Forms In A Geologic Repository
This report presents the analyses and results for the potential occurrence of external criticality events which could result from plutonium waste forms emplaced in a geologic repository similar to the one being developed at Yucca Mountain. The analyses evaluate both the MOX spent fuel and the immobilized plutonium waste forms in a repository if the waste package has degraded and if the fissile material has migrated to the invert and out into the far-field.
Report on Intact and Degraded Criticality for Selected Plutonium Waste Forms in a Geologic Repository, Volume II: Immobilized In Ceramic
Report on Intact and Degraded Criticality for Selected Plutonium Waste Forms in a Geologic Repository, Volume II: Immobilized In Ceramic
As part of the plutonium waste form development and down-select process, repository analyses have been conducted to evaluate the long-term performance of these forms for repository acceptance. Intact and degraded mode criticality analysis of mixed oxide (MOX) spent fuel is presented in Volume I, while Volume II presents the evaluations of the waste form containing plutonium immobilized in a ceramic matrix.