Program on Technology Innovation: Readiness of Existing and New U.S. Reactors for Mixed-Oxide (MOX) Fuel
Program on Technology Innovation: Readiness of Existing and New U.S. Reactors for Mixed-Oxide (MOX) Fuel
Expanding interest in nuclear power and advanced fuel cycles indicate that use of mixed-oxide (MOX) fuel in the current and new U.S. reactor fleet could become an option for utilities in the coming decades. In light of this renewed interest, EPRI has reviewed the substantial knowledge base on MOX fuel irradiation in light water reactors (LWRs). The goal was to evaluate the technical feasibility of MOX fuel use in the U.S. reactor fleet for both existing and advanced LWR designs (Generation III/III+).
Criticality Analysis of Pu and U Accumulations in a Tuff Fracture Network
Criticality Analysis of Pu and U Accumulations in a Tuff Fracture Network
The objective of this analysis is to evaluate accumulations within the thermally altered tuff surrounding a drift. The evaluation examines accumulation of uranium minerals (soddyite), plutonium oxide (Pu01), and combinations of these materials. A hypothetical model of the tuff is used to provide insight into the factors that affect criticality for this near-field scenario. The factors examined include: the size of the accumulation, the fissile composition of the accumulation, the water or clayey material fraction in the accumulation and the water fraction in the tuff
OECD/NEA: Austria
OECD/NEA: Austria
Radioactive Waste Management and Decommissioning in Austria
Radioactive Waste Management and Decommissioning in Austria
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Austrian National Report
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Austrian National Report
This report provides - a detailed description of the Austrian policy and the usual practices concerning the management of spent fuel of the Austrian research reactors and the management of radioactive waste (see Section B); - a detailed description of the Austrian legal regime concerning the management of spent fuel of the Austrian research reactors and the management of radioactive waste (see Section E).
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Austrian National Report
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Austrian National Report
In Austria there is neither a nuclear power plant (NPP) nor any other fuel cycle facility in op- eration. One NPP was constructed in Zwentendorf in the 1970s, but, as a consequence of the negative vote in a referendum never put into operation. Two out of three research reactors in Austria have been shut down (ASTRA Seibersdorf in 2000, SIEMENS Argonaut Graz in 2004) and are currently under decommissioning. The remaining TRIGA research reactor in Vienna is still in operation. Spent nuclear fuel is stored on site in wet or dry storage facilities.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting of the Contracting Parties, 15 to 24 2006, Vienna, Austria, Summary Report
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Second Review Meeting of the Contracting Parties, 15 to 24 2006, Vienna, Austria, Summary Report
1. Recognizing the importance of the safe management of spent nuclear fuel and radioactive waste, the international community agreed upon the necessity of adopting a convention describing how such safe management could be achieved: this was the origin of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (the “Joint Convention”), which was adopted on 5 September 1997 and entered into force on 18 June 2001. 2.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Third Review Meeting of the Contracting Parties, 11 to 20 May 2009, Vienna, Austria, Summary Report
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Third Review Meeting of the Contracting Parties, 11 to 20 May 2009, Vienna, Austria, Summary Report
1. Recognizing the importance of the safe management of spent nuclear fuel and radioactive waste, the international community agreed upon the necessity of adopting a convention with the objective of achieving and maintaining a high level of safety worldwide in spent fuel and radioactive waste management: this was the origin of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (the “Joint Convention”), which was adopted on 5 September 1997 and entered into force on 18 June 2001. 2.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Fourth Review Meeting of the Contracting Parties, 14 to 23 May 2012, Vienna, Austria, Final Summary Report
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Fourth Review Meeting of the Contracting Parties, 14 to 23 May 2012, Vienna, Austria, Final Summary Report
1. Recognizing the importance of the safe management of spent nuclear fuel and radioactive waste, the international community agreed upon the necessity of adopting a convention with the objective of achieving and maintaining a high level of safety worldwide in spent fuel and radioactive waste management: this was the origin of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (the “Joint Convention”), which was adopted on 5 September 1997 and entered into force on 18 June 2001. 2.
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, First Review Meeting of the Contracting Parties 3 to 14 November 2003, Vienna, Austria, Summary Report
Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, First Review Meeting of the Contracting Parties 3 to 14 November 2003, Vienna, Austria, Summary Report
1. The operation of nuclear reactors whether for the purposes of electricity production or research, generates spent nuclear fuel and radioactive waste. Other activities also generate radioactive waste. The recognition by the international community of the importance of ensuring the safety of the management of spent fuel and the safety of the management of radioactive waste, led to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (Convention).