Category of Content
Siting Experience Documents Only
Publication Date
Keywords
Cost Estimate for an Away-From-Reactor Generic Interim Storage Facility (GISF) for Spent Nuclear Fuel
Cost Estimate for an Away-From-Reactor Generic Interim Storage Facility (GISF) for Spent Nuclear Fuel
As nuclear power plants began to run out of storage capacity in spent nuclear fuel (SNF) storage pools, many nuclear operating companies added higher density pool storage racks to increase pool capacity. Most nuclear power plant storage pools have been re-racked one or more times. As many spent fuel storage pools were re-racked to the maximum extent possible, nuclear operating companies began to employ interim dry storage technologies to store SNF in certified casks and canister-based systems outside of the storage pool in independent spent fuel storage installations (ISFSIs).
Technical Bases for Extended Dry Storage of Spent Nuclear Fuel
Technical Bases for Extended Dry Storage of Spent Nuclear Fuel
Independent spent fuel storage installations (ISFSIs) are currently licensed for 20 years. However, delays in developing permanent spent fuel disposal capability require continued ISFSI storage beyond the 20-year term. This report provides a technical basis for demonstrating the feasibility of extended spent fuel storage in ISFSIs.
Reversibility and Retrievability in Planning for Geological Disposal of Radioactive Waste-Proceedings of the "R&R" International Conference and Dialogue, December 14-17, 2010, Reims, France
Reversibility and Retrievability in Planning for Geological Disposal of Radioactive Waste-Proceedings of the "R&R" International Conference and Dialogue, December 14-17, 2010, Reims, France
In 2007 the OECD Nuclear Energy Agency (NEA) Radioactive Waste Management Committee
(RWMC) launched a four-year project on the topics of reversibility and retrievability in geological
disposal. The goal of the project studies and activities (www.oecd-nea.org/rwm/rr) was to
acknowledge the range of approaches to reversibility and retrievability (R&R), rather than to
recommend a specific approach, and to provide a basis for reflection rather than to lead towards
Evaluation of Options for Permanent Geologic Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste in Support of a Comprehensive National Nuclear Fuel Cycle Strategy, Volume I and Volume II (Appendices)
Evaluation of Options for Permanent Geologic Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste in Support of a Comprehensive National Nuclear Fuel Cycle Strategy, Volume I and Volume II (Appendices)
This study provides a technical basis for informing policy decisions regarding strategies for the management and permanent disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) in the United States requiring geologic isolation. Relevant policy questions this study can help inform include the following: Is a “one-size-fits–all” repository a good strategic option for disposal? Do
THERMAL PERFORMANCE SENSITIVITY STUDIES IN SUPPORT OF MATERIAL MODELING FOR EXTENDED STORAGE OF USED NUCLEAR FUEL
THERMAL PERFORMANCE SENSITIVITY STUDIES IN SUPPORT OF MATERIAL MODELING FOR EXTENDED STORAGE OF USED NUCLEAR FUEL
The work reported here is an investigation of the sensitivity of component temperatures in a specific storage system, including fuel cladding temperatures, in response to modeling assumptions that differ from design-basis, including age-related changes that could degrade the thermal behavior of the system. Preliminary evaluations of representative horizontal and vertical storage systems at design basis conditions provides general insight into the expected behavior of storage systems over extended periods of time.
DECOMMISSIONING COST ANALYSIS for the CLINTON POWER STATION
DECOMMISSIONING COST ANALYSIS for the CLINTON POWER STATION
<div class="page" title="Page 1">
<div class="section">
<div class="layoutArea">
<div class="column">
Crystal River Unit 3 -- UPDATED IRRADIATED FUEL MANAGEMENT PROGRAM- 10 CFR 50.54(bb) and SITE-SPECIFIC DECOMMISSIONING COST ESTIMATE FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT
Crystal River Unit 3 -- UPDATED IRRADIATED FUEL MANAGEMENT PROGRAM- 10 CFR 50.54(bb) and SITE-SPECIFIC DECOMMISSIONING COST ESTIMATE FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT
<div class="page" title="Page 2">
<div class="layoutArea">
<div class="column">
Kewaunee Power Station -- Post-Shutdown Decommissioning Activities Report
Kewaunee Power Station -- Post-Shutdown Decommissioning Activities Report
<div class="page" title="Page 8">
<div class="layoutArea">
<div class="column">
Factors Affecting Public and Political Acceptance for the Implementation of Geological Disposal
Factors Affecting Public and Political Acceptance for the Implementation of Geological Disposal
The main objective of this report is to identify conditions which affect public concern (either
increase or decrease) and political acceptance for developing and implementing programmes
for geologic disposal of long-lived radioactive waste. It also looks how citizens and relevant
actors can be associated in the decision making process in such a way that their input is
enriching the outcome towards a more socially robust and sustainable solution. Finally, it
aims at learning from the interaction how to optimise risk management addressing needs and