Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Keywords
Monitored Retrievable Storage Facility Conceptual Design Report
Monitored Retrievable Storage Facility Conceptual Design Report
Monitored Retrievable Storage Facility Design Criteria Policy Document - 2nd Draft
Monitored Retrievable Storage Facility Design Criteria Policy Document - 2nd Draft
Preliminary Site Requirements and Considerations for a Monitored Retrievable Storage Facility
Preliminary Site Requirements and Considerations for a Monitored Retrievable Storage Facility
In the November 1989 Report to Congress on Reassessment of the Civilian
Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy
announced an initiative for developing a monitored retrievable storage (MRS) facility
that is to start spent-fuel acceptance in 1998. This facility, which will be licensed by
the U.S. Nuclear Regulatory Commission (NRC), will receive spent fuel from
commercial nuclear power plants and provide a limited amount of storage for this
A Monitored Retrievable Storage Facility: Technical Background Information
A Monitored Retrievable Storage Facility: Technical Background Information
Managing the Nation's Commercial High-Level Radioactive Waste
Managing the Nation's Commercial High-Level Radioactive Waste
With the passage of the Nuclear Waste Policy Act of 1982 (NWPA), Congress for the first time established in law a comprehensive Federal policy for commercial high-level radioactive waste management, including interim storage and permanent disposal. NWPA provides sufficient authority for
developing and operating a high-level radioactive waste management system based on disposal in mined geologic repositories. Authorization
Nuclear Waste: Is There a Need for Federal Interim Storage--Executive Summary--Report of the Monitored Retrievable Storage Commission
Nuclear Waste: Is There a Need for Federal Interim Storage--Executive Summary--Report of the Monitored Retrievable Storage Commission
Dry Cask Storage of Nuclear Spent Fuel
Dry Cask Storage of Nuclear Spent Fuel
Cost Estimate for an Away-From-Reactor Generic Interim Storage Facility (GISF) for Spent Nuclear Fuel
Cost Estimate for an Away-From-Reactor Generic Interim Storage Facility (GISF) for Spent Nuclear Fuel
As nuclear power plants began to run out of storage capacity in spent nuclear fuel (SNF) storage pools, many nuclear operating companies added higher density pool storage racks to increase pool capacity. Most nuclear power plant storage pools have been re-racked one or more times. As many spent fuel storage pools were re-racked to the maximum extent possible, nuclear operating companies began to employ interim dry storage technologies to store SNF in certified casks and canister-based systems outside of the storage pool in independent spent fuel storage installations (ISFSIs).
Technical Bases for Extended Dry Storage of Spent Nuclear Fuel
Technical Bases for Extended Dry Storage of Spent Nuclear Fuel
Independent spent fuel storage installations (ISFSIs) are currently licensed for 20 years. However, delays in developing permanent spent fuel disposal capability require continued ISFSI storage beyond the 20-year term. This report provides a technical basis for demonstrating the feasibility of extended spent fuel storage in ISFSIs.
The DOE Position on the MRS Facility
The DOE Position on the MRS Facility
slides - ISFSI Pad Design Issues
slides - ISFSI Pad Design Issues
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
slides - ISFSI Security Rulemaking Update
slides - ISFSI Security Rulemaking Update
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
slides - ISFSI Security Rulemaking Update
slides - ISFSI Security Rulemaking Update
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
Monitored Retrievable Storage Project Plan
Monitored Retrievable Storage Project Plan
The purpose of this document is to describe the Monitored Retrievable Storage (MRS) Project and to establish approved cost and schedule baselines against which overall progress and management effectiveness shall be measured. For the sake of brevity, this Project Plan will be referred to as the Plan throughout this document.
1999 Design Basis Waste Input Report for Commercial Spent Nuclear Fuel
1999 Design Basis Waste Input Report for Commercial Spent Nuclear Fuel
The purpose of this document is to provide waste quantity and sequencing information that serves as the design basis for commercial spent nuclear fuel (CSNF) arriving at the repository, and the information on the transportation systems that will be used to deliver this fuel. It is intended as input for waste package and repository design analyses needed to ensure that facilities are flexible enough to be capable of receiving, unloading, handling, and emplacing the amounts and types of CSNF expected for receipt under realistic bounding conditions.
slides - Prairie Island ISFSI License Renewal and High Burn Up Fuel Contention
slides - Prairie Island ISFSI License Renewal and High Burn Up Fuel Contention
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
Preliminary Feasibility Assessment for Several Specific MRS Design Alternatives with the Potential for Early Deployment Revision1
Preliminary Feasibility Assessment for Several Specific MRS Design Alternatives with the Potential for Early Deployment Revision1
This vintage 1990 document presents the results of WESTON'S preliminary assessment of the feasibility of several alternative fuel-transfer and storage concepts that have the potential for early spent-fuel acceptance at an MRS facility. The feasibility study was part of a series of studies conducted by the U.S. Department of Energy (DOE) during the late 1980's and early 1990's in an effort to establish an MRS design configuration.
THERMAL PERFORMANCE SENSITIVITY STUDIES IN SUPPORT OF MATERIAL MODELING FOR EXTENDED STORAGE OF USED NUCLEAR FUEL
THERMAL PERFORMANCE SENSITIVITY STUDIES IN SUPPORT OF MATERIAL MODELING FOR EXTENDED STORAGE OF USED NUCLEAR FUEL
The work reported here is an investigation of the sensitivity of component temperatures in a specific storage system, including fuel cladding temperatures, in response to modeling assumptions that differ from design-basis, including age-related changes that could degrade the thermal behavior of the system. Preliminary evaluations of representative horizontal and vertical storage systems at design basis conditions provides general insight into the expected behavior of storage systems over extended periods of time.
MRS Siting Briefing
MRS Siting Briefing
This briefing paper is a component of the comprehensive briefing package developed for the Negotiator, and describes previous DOE experience in its attempt to site an MRS facility. The Background section highlights, in chronological order, significant events in DOE's MRS siting history from enactment of the Nuclear Waste Policy Act of 1982 to the issuance of the "Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program" in November 1989.
Wyoming Decline of MRS
Wyoming Decline of MRS
This letter is written by Former Wyoming Governor Mike Sullivan to inform the Fremont County Commissioners of his conclusion to decline the MRC facility.
DECOMMISSIONING COST ANALYSIS for the CLINTON POWER STATION
DECOMMISSIONING COST ANALYSIS for the CLINTON POWER STATION
<div class="page" title="Page 1">
<div class="section">
<div class="layoutArea">
<div class="column">
Crystal River Unit 3 -- UPDATED IRRADIATED FUEL MANAGEMENT PROGRAM- 10 CFR 50.54(bb) and SITE-SPECIFIC DECOMMISSIONING COST ESTIMATE FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT
Crystal River Unit 3 -- UPDATED IRRADIATED FUEL MANAGEMENT PROGRAM- 10 CFR 50.54(bb) and SITE-SPECIFIC DECOMMISSIONING COST ESTIMATE FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT
<div class="page" title="Page 2">
<div class="layoutArea">
<div class="column">
Kewaunee Power Station -- Post-Shutdown Decommissioning Activities Report
Kewaunee Power Station -- Post-Shutdown Decommissioning Activities Report
<div class="page" title="Page 8">
<div class="layoutArea">
<div class="column">
House Report 97-491, Part 1, “Report to Accompany H.R. 3809" Pg 44
House Report 97-491, Part 1, “Report to Accompany H.R. 3809" Pg 44
This report accompanies the Nuclear Waste Policy Act of 1982. Only page 44 is included in this PDF.