EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV—Lessons Learned
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV—Lessons Learned
The effective termination of the Yucca Mountain program by the U.S. Administration in 2009
has further delayed the construction and operation of a permanent disposal facility for used fuel
and high level radioactive waste (HLW) in the United States. In concert with this decision, the
President directed the Energy Secretary to establish the Blue Ribbon Commission on America’s
Nuclear Future to review and provide recommendations on options for managing used fuel and
Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites
Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites
Consolidated Interim Storage of Commercial Spent Nuclear Fuel-A Technical and Programmatic Assessment
Consolidated Interim Storage of Commercial Spent Nuclear Fuel-A Technical and Programmatic Assessment
Approximately 54,000 tons of spent nuclear fuel are stored at operating nuclear power plants and several decommissioned power plants throughout the country. Spent fuel storage at these sites was never intended to be permanent. The current Federal plan is to place the fuel in a repository for permanent disposal in Nevada at Yucca Mountain.
Nuclear Waste: Is There a Need for Federal Interim Storage--Executive Summary--Report of the Monitored Retrievable Storage Commission
Nuclear Waste: Is There a Need for Federal Interim Storage--Executive Summary--Report of the Monitored Retrievable Storage Commission
Directory of Certificates of Compliance for Radioactive Materials Packages (NUREG-0383)
Directory of Certificates of Compliance for Radioactive Materials Packages (NUREG-0383)
The purpose of this directory is to make available a convenient source of information on package designs approved by the U.S. Nuclear Regulatory Commission. To assist in identifying packages, an index by Model Number and corresponding Certificate of Compliance Number is included at the front of Volume 2. The report includes all package designs approved prior to the publication date of the directory as of September 2013.
Key Issues Associated with Interim Storage of Used Nuclear Fuel
Key Issues Associated with Interim Storage of Used Nuclear Fuel
The issue of interim storage of used (spent)1 fuel is dependent on a number of key factors, some
of which are not known at this time but are the subject of this study. The first is whether or not
the Yucca Mountain Project continues or is cancelled such that it may be able to receive spent
fuel from existing and decommissioned nuclear power stations. The second is whether the United
States will pursue a policy of reprocessing and recycling nuclear fuel. The reprocessing and
Transportation of Commercial Spent Nuclear Fuel Regulatory Issues Resolution
Transportation of Commercial Spent Nuclear Fuel Regulatory Issues Resolution
The U.S. industry’s limited efforts at licensing transportation packages characterized as “highcapacity,”
or containing “high-burnup” (>45 GWd/MTU) commercial spent nuclear fuel
(CSNF), or both, have not been successful considering existing spent-fuel inventories that will
have to be eventually transported. A holistic framework is proposed for resolving several CSNF
transportation issues. The framework considers transportation risks, spent-fuel and cask-design
Advanced Nuclear Fuel Cycles -- Main Challenges and Strategic Choices
Advanced Nuclear Fuel Cycles -- Main Challenges and Strategic Choices
This report presents the results of a critical review of the technological challenges to the growth of nuclear energy, emerging advanced technologies that would have to be deployed, and fuel cycle strategies that could conceivably involve interim storage, plutonium recycling in thermal and fast reactors, reprocessed uranium recycling, and transmutation of minor actinide elements and fission products before eventual disposal of residual wastes.
Cost Estimate for an Away-From-Reactor Generic Interim Storage Facility (GISF) for Spent Nuclear Fuel
Cost Estimate for an Away-From-Reactor Generic Interim Storage Facility (GISF) for Spent Nuclear Fuel
As nuclear power plants began to run out of storage capacity in spent nuclear fuel (SNF) storage pools, many nuclear operating companies added higher density pool storage racks to increase pool capacity. Most nuclear power plant storage pools have been re-racked one or more times. As many spent fuel storage pools were re-racked to the maximum extent possible, nuclear operating companies began to employ interim dry storage technologies to store SNF in certified casks and canister-based systems outside of the storage pool in independent spent fuel storage installations (ISFSIs).
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned
EPRI Review of Geologic Disposal for Used Fuel and High Level Radioactive Waste: Volume IV - Lessons Learned
The effective termination of the Yucca Mountain program by the U.S. Administration in 2009 has further delayed the construction and operation of a permanent disposal facility for used fuel and high level radioactive waste (HLW) in the United States. In concert with this decision, the President directed the Energy Secretary to establish the Blue Ribbon Commission on America's Nuclear Future to review and provide recommendations on options for managing used fuel and HLW.
Nuclear Waste: Is There a Need for Federal Interim Storage? Report of the Monitored Retrievable Storage Review Commission
Nuclear Waste: Is There a Need for Federal Interim Storage? Report of the Monitored Retrievable Storage Review Commission
Civilian Nuclear Spent Fuel Temporary Storage Options
Civilian Nuclear Spent Fuel Temporary Storage Options
The Department of Energy (DOE) is studying a site at Yucca Mountain, Nevada, for a
permanent underground repository for highly radioactive spent fuel from nuclear reactors,
but delays have pushed back the facility’s opening date to 2010 at the earliest. In the
meantime, spent fuel is accumulating at U.S. nuclear plant sites at the rate of about 2,000
metric tons per year. Major options for managing those growing quantities of nuclear spent
fuel include continued storage at reactors, construction of a DOE interim storage site near
Disposal and Storage of Spent Nuclear Fuel — Finding the Right Balance
Disposal and Storage of Spent Nuclear Fuel — Finding the Right Balance
The Nuclear Waste Policy Act of 1982, as amended, established a statutory basis
for managing the nation’s civilian (or commercially produced) spent nuclear
fuel. The law established a process for siting, developing, licensing, and constructing
an underground repository for the permanent disposal of that waste.
Utilities were given the primary responsibility for storing spent fuel until it is
accepted by the Department of Energy (DOE) for disposal at a repository —
originally expected to begin operating in 1998. Since then, however, the repository
Consolidated Interim Storage of Commercial Spent Nuclear Fuel
Consolidated Interim Storage of Commercial Spent Nuclear Fuel
Approximately 54,000 tons of spent nuclear fuel are stored at operating nuclear power plants and several decommissioned power plants throughout the country. Spent fuel storage at these sites was never intended to be permanent. The current Federal plan is to place the fuel in a repository for permanent disposal in Nevada at Yucca Mountain.
Spent Nuclear Fuel Management: How centralized interim storage can expand options and reduce costs
Spent Nuclear Fuel Management: How centralized interim storage can expand options and reduce costs
The purpose of this study is to assist decision makers in evaluating the centralized interim
storage option. We explore the economics of centralized interim storage under a wide variety of
circumstances. We look at how a commitment to move forward with centralized interim storage
today could evolve over time. And, we evaluate the costs of reversing a commitment toward
centralized storage if it turns out that such a decision is later considered a mistake. We have not
Overview of the Nuclear Regulatory Commission and Its Regulatory Process for the Nuclear Fuel Cycle for Light Water Reactors
Overview of the Nuclear Regulatory Commission and Its Regulatory Process for the Nuclear Fuel Cycle for Light Water Reactors
This paper provides a brief description of the United States Nuclear Regulatory Commission (NRC) and its regulatory process for the current nuclear fuel cycle for light water power reactors (LWRs). It focuses on the regulatory framework for the licensing of facilities in the fuel cycle. The first part of the paper provides an overview of the NRC and its regulatory program including a description of its organization, function, authority, and responsibilities.
Key Issues Associated with Interim Storage of Used Nuclear Fuel
Key Issues Associated with Interim Storage of Used Nuclear Fuel
The issue of interim storage of used (spent)1 fuel is dependent on a number of key factors, some
of which are not known at this time but are the subject of this study. The first is whether or not
the Yucca Mountain Project continues or is cancelled such that it may be able to receive spent
fuel from existing and decommissioned nuclear power stations. The second is whether the United
States will pursue a policy of reprocessing and recycling nuclear fuel. The reprocessing and
SOCIAL DISTRUST: IMPLICATIONS AND RECOMMENDATION FOR SPENT NUCLEAR FUEL AND HIGH LEVEL RADIOACTIVE WASTE MANAGEMENT
SOCIAL DISTRUST: IMPLICATIONS AND RECOMMENDATION FOR SPENT NUCLEAR FUEL AND HIGH LEVEL RADIOACTIVE WASTE MANAGEMENT
The management of spent nuclear fuel (SNF) and defense high level waste (HLW) is a complex sociotechnical
systems challenge. Coordinated, reliable, and safe performance will be required over very long
periods of time within evolving social and technical contexts. To accomplish these goals, a waste
management system will involve a host of facilities for interim storage and longterm disposal, a
transportation infrastructure, and research and development centers. The complexity of SNF and HLW
Geological Disposal of Radioactive Waste
Geological Disposal of Radioactive Waste
The objective of this safety requirements publication is to set down the protection objectives and criteria for geological disposal and to establish the requirements that must be met to ensure the safety of this disposal option, consistent with the established principles of safety for radioactive waste management.
Nuclear Waste: Is There A Need For Federal Interim Storage?
Nuclear Waste: Is There A Need For Federal Interim Storage?
About 20,000 metric tons of spent, or used, nuclear
fuel have accumulated since the beginning of commercial
nuclear power prbduction in the United States. At the end
of the currently licensed period of all existing nuclear power
plants and those under construction, the amount of spent
nuclear fuel is expected to total 87,000 metric tons.
Thus far, practically all of the spent nuclear fuel is
stored in water-filled pools at reactor sites. However, space
does not exist in the pools to store all the spent fuel expected
Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites
Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites
This report discusses the status of the commercial spent nuclear fuel (SNF) inventory in the United States, at both decommissioned and operating commercial nuclear power reactor sites; summarizes the contractual arrangement the government and utilities have under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (10 CFR Part 961) (Standard Contract), related litigation, and the financial liabilities resulting from the Department’s delay in performance under these contracts; provides a history of interim storage policy as it relates to commercial SN
Enhancing the Role of State and Local Governments in America’s Nuclear Future: An Idea Whose Time Has Come
Enhancing the Role of State and Local Governments in America’s Nuclear Future: An Idea Whose Time Has Come
This paper, prepared to aid the Blue Ribbon Commission on America’s Nuclear Future in its
deliberations, includes a discussion of the issues that would be faced in the siting, permitting and
licensing of storage and disposal facilities for the “back end” of the commercial nuclear fuel
cycle and for the Department of Energy’s (DOE) high–level radioactive waste. It discusses the
authority that could be employed by non–federal levels of government in supporting or opposing
Cost Implications of an Interim Storage Facility in the Waste Management System
Cost Implications of an Interim Storage Facility in the Waste Management System
This report provides an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). Specifically, the impacts of the timing of opening an ISF relative to opening a repository were analyzed to understand the potential effects on total system costs.
Centralized InterimStorage Facility Topical Safety Report
Centralized InterimStorage Facility Topical Safety Report
The Centralized Interim Storage Facility (CISF) is designed as a temporary, above-ground away-from-reactor spent fuel storage installation for up to 40,000 metric tons of uranium (MTU). The design is non-site-specific but incorporates conservative environmental and design factors (e.g., 360 mph tornado and 0.75 g seismic loading) intended to be capable of bounding subsequent site-specific factors. Spent fuel is received in dual-purpose canister systems and/or casks already approved for transportation and storage by the Nuclear Regulatory Commission (NRC).