Background Paper on Commingling of Defense and Commercial Waste
Background Paper on Commingling of Defense and Commercial Waste
Since a 1985 decision by President Reagan that a separate permanent repository for disposal of
defense high level waste was not required1, DOE has planned for disposal of all high-level waste
and spent fuel from national defense activities and DOE’s own research activities in a repository
for commercial waste developed under the Nuclear Waste Policy Act (NWPA). The Commission
has heard recommendations from some commenters2 that this decision be revisited, or even
DOE SNF Phase I and II Summary Report
DOE SNF Phase I and II Summary Report
There are more than 250 forms of U.S. Department of Energy (DOE)owned spent nuclear fuel (SNF). Due to the variety of the spent nuclear fuel, the National Spent Nuclear Fuel Program (NSNFP) has designated nine representative fuel groups for disposal criticality analyses based on fuel matrix, primary fissile isotope, and enrichment. For each fuel group, a fuel type that represents the characteristics of all fuels in that group has been selected for detailed analysis.
History, Structure and Institutional Overview of the Nuclear Waste Policy Act of 1982
History, Structure and Institutional Overview of the Nuclear Waste Policy Act of 1982
The Nuclear Waste Policy Act of 1982 (NWPA) established a program to deal comprehensively with the waste byproducts of nuclear power generation, as well as defense-related radioactive wastes, if appropriate. Under this program, the federal Department of Energy (DOE) must locate and develop a site for disposal of high-level radioactive wastes in a geologic setting capable of isolating them from adverse public and environmental exposure for at least 10,000 and up to 100,000 years.
Criticality Safety and Shielding Evaluations of the Codisposal Canister in the Five-Pack DHLW Waste Package
Criticality Safety and Shielding Evaluations of the Codisposal Canister in the Five-Pack DHLW Waste Package
The objective of this analysis is to characterize a codisposal canister containing MIT or ORR fuel in the Five-Pack defense high level waste (DHLW) waste package (WP) to demonstrate concept viability related to use in the Mined Geologic Disposal System (MGDS) environment for the postclosure time frame. The purpose of this analysis is to investigate the disposal criticality and shielding issues for the DHLW WP and establish DHLW WP and codisposal canister compatibility with the MGDS, and to provide criticality and shielding evaluations for the preliminary DHLW WP design.
Letter - Request Approval to Establish and Populate the Ad Hoc Subcommittee on Co‐mingling of Defense and Commercial Wastes
Letter - Request Approval to Establish and Populate the Ad Hoc Subcommittee on Co‐mingling of Defense and Commercial Wastes
Dear Tim:
As we work to complete our final recommendations to the Secretary by January 29, 2012,
we have determined that our efforts would be aided by the formation of an ad hoc
subcommittee to investigate the issue of co‐mingling of defense and commercial wastes.
Specifically, the ad hoc subcommittee would review and make a recommendation to the
Commission on the issue of whether the 1985 Presidential decision to co‐mingle defense
and commercial wastes for disposal should be revisited in light of changes that have
Co-Mingled and Defense-Only Repositories
Co-Mingled and Defense-Only Repositories
At the request of the staff to the Blue Ribbon Commission on America’s Nuclear Future (“BRC”), we have reviewed the following questions:
1. Is there legal authority for DOE or any other entity to undertake to site a repository for “co-mingled” nuclear materials (i.e., civilian and defense spent nuclear fuel (SNF) and high-level radioactive waste (HLW)) at any site other than Yucca Mountain?
Disposal Criticality Analysis for Aluminum-based Fuel in a Codisposal Waste Package - ORR and MIT SNF - Phase II
Disposal Criticality Analysis for Aluminum-based Fuel in a Codisposal Waste Package - ORR and MIT SNF - Phase II
The objective of this analysis is to characterize the criticality safety aspects of a degraded Department of Energy spent nuclear fuel (DOESNF) canister containing Masachusetts Institute of Technology (MIT) or Oak Ridge Research (ORR) fuel in the Five Pack defense high level waste (DHLW) waste package to demonstrate concept viability related to use in the Minded Geologic Disposal System (MGDS) environment for the postclosure time frame.
Nuclear Waste Bill Feedback
Nuclear Waste Bill Feedback
On April 25, 2013, Senators Wyden, Alexander, Feinstein, and Murkowski released a draft bill to create a sustainable, participatory process for managing nuclear waste. The senators requested comments and suggestions on the draft bill, as well as on the alternative language for siting an interim storage facility proposed by Senators Alexander and Feinstein. In addition, the senators posed eight questions on which they sought comments.
Letter - Approval of Request to Establish and Populate an Ad Hoc Subcommittee on the Co-Mingling of Defense and Commercial Waste
Letter - Approval of Request to Establish and Populate an Ad Hoc Subcommittee on the Co-Mingling of Defense and Commercial Waste
Gentlemen,
In accordance with the charter of the Blue Ribbon Commission on America's Nuclear Future and as the Secretary's designee, I approve your request to establish an ad hoc subcommittee to review and make a recommendation to the Commission regarding the co-mingling of defense and commercial waste.
This letter also serves to appoint Dr. Allison Macfarlane as the chair of the subcommittee and the membership of the subcommittee as identified in your letter to me dated October 31, 2011.
Criticality Evaluation of Plutonium Disposition Ceramic Waste Form: Degraded Mode
Criticality Evaluation of Plutonium Disposition Ceramic Waste Form: Degraded Mode
Thep purpose of this calculation is to perform degraded mode criticality evaluations of plutonium disposed in a ceramic waste form and emplaced in a Monitored geologic Repository (MGR). A 5 Defense High-Level Waste (DHLW) Canister Waste Package (WP) design, incorporating the can-in-canister concept for plutonium immobilization is considered in this calculation. Each HLW glass pour canister contains 7 tubes. Each tube contains 4 cans, with 20 ceramic disks (immobilized plutonium) in each.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of The North Shore
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of The North Shore
On March 21, 2012, the Township of The North Shore expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Geofirma Engineering Ltd., to evaluate the potential suitability of the Township of The North Shore against five screening criteria using readily-available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA’S USED NUCLEAR FUEL - Corporation of the Municipality of Arran-Elderslie
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA’S USED NUCLEAR FUEL - Corporation of the Municipality of Arran-Elderslie
On June 25, 2012 the Corporation of the Municipality of Arran-Elderslie expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by AECOM, to evaluate the potential suitability of the Municipality of Arran-Elderslie against five screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Schreiber
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Schreiber
On September 28, 2010, the Township of Schreiber expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the Schreiber area against five screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of White River
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of White River
On April 11, 2012 the Township of White River expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the White River area against five initial screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Nipigon
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Nipigon
On November 9, 2011, the Township of Nipigon expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel ( NWMO, 2010). This report presents the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the Nipigon area against five initial screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Ear Falls, Ontario
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Ear Falls, Ontario
On August 26, 2010, the Township of Ear Falls expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the Ear Falls area against five screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - City of Elliot Lake
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - City of Elliot Lake
On March 12, 2012, the City of Elliot Lake expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Geofirma Engineering Ltd., to evaluate the potential suitability of the City of Elliot Lake against five screening criteria using readilyavailable information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Corporation of the Municipality of South Bruce
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Corporation of the Municipality of South Bruce
On, March 27, 2012, the Corporation of the Municipality of South Bruce expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by AECOM, to evaluate the potential suitability of the Municipality of South Bruce against five screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Red Rock
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Red Rock
On February 25, 2011, the Township of Red Rock expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s use d nuclear fuel (NWMO, 2010). This report presents the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the Red Rock area against five initial screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Town of Spanish
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Town of Spanish
On March 21, 2012, the Town of Spanish expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Geofirma Engineering Ltd., to evaluate the potential suitability of the Town of Spanish against five screening criteria using readily available information.
Report on NWMO-First Nations Quebec and Labrador Sustainable Development Institute Project, Discussion Project between the First Nations and the NWMO
Report on NWMO-First Nations Quebec and Labrador Sustainable Development Institute Project, Discussion Project between the First Nations and the NWMO
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Town of Blind River, Ontario
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Town of Blind River, Ontario
On March 19, 2012, the Town of Blind River expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Geofirma Engineering Ltd., to evaluate the potential suitability of the Town of Blind River against five screening criteria using readilyavailable information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Municipality of Wawa
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Municipality of Wawa
On May 3, 2011, the Municipality of Wawa expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Geofirma Engineering Ltd., to evaluate the potential suitability of the Wawa area against five screening criteria using readily available information.
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Hornepayne
INITIAL SCREENING FOR SITING A DEEP GEOLOGICAL REPOSITORY FOR CANADA'S USED NUCLEAR FUEL - Township of Hornepayne
On March 21, 2011, the Township of Hornepayne expressed interest in learning more about the Nuclear Waste Management Organization (NWMO) site selection process to find an informed and willing community to host a deep geological repository for Canada’s used nuclear fuel (NWMO, 2010). This report summarizes the findings of an initial screening, conducted by Golder Associates Ltd., to evaluate the potential suitability of the Hornepayne area against five screening criteria using readily available information.