Category of Content
Siting Experience Documents Only
Publication Date
Country
Keywords
Dry Cask Storage of Nuclear Spent Fuel
Dry Cask Storage of Nuclear Spent Fuel
Cost Estimate for an Away-From-Reactor Generic Interim Storage Facility (GISF) for Spent Nuclear Fuel
Cost Estimate for an Away-From-Reactor Generic Interim Storage Facility (GISF) for Spent Nuclear Fuel
As nuclear power plants began to run out of storage capacity in spent nuclear fuel (SNF) storage pools, many nuclear operating companies added higher density pool storage racks to increase pool capacity. Most nuclear power plant storage pools have been re-racked one or more times. As many spent fuel storage pools were re-racked to the maximum extent possible, nuclear operating companies began to employ interim dry storage technologies to store SNF in certified casks and canister-based systems outside of the storage pool in independent spent fuel storage installations (ISFSIs).
Technical Bases for Extended Dry Storage of Spent Nuclear Fuel
Technical Bases for Extended Dry Storage of Spent Nuclear Fuel
Independent spent fuel storage installations (ISFSIs) are currently licensed for 20 years. However, delays in developing permanent spent fuel disposal capability require continued ISFSI storage beyond the 20-year term. This report provides a technical basis for demonstrating the feasibility of extended spent fuel storage in ISFSIs.
slides - ISFSI Pad Design Issues
slides - ISFSI Pad Design Issues
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
slides - ISFSI Security Rulemaking Update
slides - ISFSI Security Rulemaking Update
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
slides - ISFSI Security Rulemaking Update
slides - ISFSI Security Rulemaking Update
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
Yankee Atomic Electric Company vs The United States, November 14, 2013
Yankee Atomic Electric Company vs The United States, November 14, 2013
Spent Nuclear Fuel Litigation - Court of Federal Claims decision in Maine Yankee II, Conn Yankee II and Yankee Atomic II
slides - Prairie Island ISFSI License Renewal and High Burn Up Fuel Contention
slides - Prairie Island ISFSI License Renewal and High Burn Up Fuel Contention
Presented at the NEI Used Fuel Management Conference, St. Petersburg, FL, May 7-9, 2013
THERMAL PERFORMANCE SENSITIVITY STUDIES IN SUPPORT OF MATERIAL MODELING FOR EXTENDED STORAGE OF USED NUCLEAR FUEL
THERMAL PERFORMANCE SENSITIVITY STUDIES IN SUPPORT OF MATERIAL MODELING FOR EXTENDED STORAGE OF USED NUCLEAR FUEL
The work reported here is an investigation of the sensitivity of component temperatures in a specific storage system, including fuel cladding temperatures, in response to modeling assumptions that differ from design-basis, including age-related changes that could degrade the thermal behavior of the system. Preliminary evaluations of representative horizontal and vertical storage systems at design basis conditions provides general insight into the expected behavior of storage systems over extended periods of time.
DECOMMISSIONING COST ANALYSIS for the CLINTON POWER STATION
DECOMMISSIONING COST ANALYSIS for the CLINTON POWER STATION
<div class="page" title="Page 1">
<div class="section">
<div class="layoutArea">
<div class="column">
Crystal River Unit 3 -- UPDATED IRRADIATED FUEL MANAGEMENT PROGRAM- 10 CFR 50.54(bb) and SITE-SPECIFIC DECOMMISSIONING COST ESTIMATE FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT
Crystal River Unit 3 -- UPDATED IRRADIATED FUEL MANAGEMENT PROGRAM- 10 CFR 50.54(bb) and SITE-SPECIFIC DECOMMISSIONING COST ESTIMATE FOR THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT
<div class="page" title="Page 2">
<div class="layoutArea">
<div class="column">
Kewaunee Power Station -- Post-Shutdown Decommissioning Activities Report
Kewaunee Power Station -- Post-Shutdown Decommissioning Activities Report
<div class="page" title="Page 8">
<div class="layoutArea">
<div class="column">
ORDER GRANTING APPLICATIONS TO REDUCE RATES UNDER WHOLESALE POWER CONTRACTS
ORDER GRANTING APPLICATIONS TO REDUCE RATES UNDER WHOLESALE POWER CONTRACTS
<div class="page" title="Page 1">
<div class="layoutArea">
<div class="column">
ISFSI Location Information
ISFSI Location Information
Email from Steven Kraft to Alex Thrower
Map-U.S. Independent Spent Fuel Storage Installations
Map-U.S. Independent Spent Fuel Storage Installations
Map-U.S. Independent Spent Fuel Storage Installations
European Union Contract Number: FP6-036413. Deliverable 23b. Towards Implementation of Transparency and Participation in Radioactive Waste Management Programmes, ARGONA Final Summary Report
European Union Contract Number: FP6-036413. Deliverable 23b. Towards Implementation of Transparency and Participation in Radioactive Waste Management Programmes, ARGONA Final Summary Report
The point of departure for the ARGONA project is that participation and transparency are key elements of effective risk governance and the acronym ARGONA stands for "Arenas for Risk Governance ". Given the overall objectives, ARGONA intended to demonstrate how participation and transparency link to the political and legal systems and how new approaches can be implemented in radioactive waste management programmes.
Attitudes Towards Radioactive Waste in Switzerland
Attitudes Towards Radioactive Waste in Switzerland
European Union Contract Number: FP6-036413. Deliverable 23a. Towards Implementation of Transparency and Participation in Radioactive Waste Management Programmes, ARGONA Final Report
European Union Contract Number: FP6-036413. Deliverable 23a. Towards Implementation of Transparency and Participation in Radioactive Waste Management Programmes, ARGONA Final Report
ARGONA is a project within the European Commission 6th framework programme. The overall objective was to support transparency of decision-making processes in the radioactive waste programmes of the participating countries, and also of the European Union, by means of a greater degree of public participation.
La Crosse: Operation, Decommissiong, and the interim storage of spent nuclear fuel
La Crosse: Operation, Decommissiong, and the interim storage of spent nuclear fuel
European Union Contract Number: FP6-036413. Deliverable 22. ARGONA Project, Suggested Guidelines for Transparency and Participation in Nuclear Waste Management Programmes
European Union Contract Number: FP6-036413. Deliverable 22. ARGONA Project, Suggested Guidelines for Transparency and Participation in Nuclear Waste Management Programmes
These proposed guidelines are recommendations that have emerged from the European Union Research Project ARGONA (Arenas for Risk Governance), Contract no.: FP6-036413
Civilian Nuclear Spent Fuel Temporary Storage Options
Civilian Nuclear Spent Fuel Temporary Storage Options
The Department of Energy (DOE) is studying a site at Yucca Mountain, Nevada, for a permanent underground repository for highly radioactive spent fuel from nuclear reactors, but delays have pushed back the facility’s opening date to 2010 at the earliest. In the meantime, spent fuel is accumulating at U.S. nuclear plant sites at the rate of about 2,000 metric tons per year. Major options for managing those growing quantities of nuclear spent fuel include continued storage at reactors, construction of a DOE interim storage site near Yucca Mountain, and licensing of private storage facilities.
Strong Local Support for Final Repository
Strong Local Support for Final Repository
Local support in favor of a final repository for spent nuclear in one's own municipality has increased somewhat in both Oskarshamn and Östhammar. This is shown by the annual public opinion poll that was conducted by Synovate on behalf of SKB.
Continuing Cooperation with Two Municipalities
Continuing Cooperation with Two Municipalities
Web page from SKB's website (Swedish Nuclear Fuel and Waste Management Company) discussing the ongoing cooperation between SKB and both Östhammar, where the repository is to be sited, and Oskarshamn, where the encapsulation plant is to be located.
The Cigéo Project: Meuse/Haute-Marne Reversible Geological Disposal Facility for Radioactive Waste
The Cigéo Project: Meuse/Haute-Marne Reversible Geological Disposal Facility for Radioactive Waste
Report prepared by ANDRA, the French National Radioactive Waste Management Agency, for preparing for public debate in 2013.