Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Keywords
Criticality Consequence Analysis Involving Intact PWR SNF in a Degraded 21 PWR Assembly Waste Package
Criticality Consequence Analysis Involving Intact PWR SNF in a Degraded 21 PWR Assembly Waste Package
Intact and Degraded Mode Criticality Calculations for the Codisposal of ATR Spent Nuclear Fuel in a Waste Package
Intact and Degraded Mode Criticality Calculations for the Codisposal of ATR Spent Nuclear Fuel in a Waste Package
Technical Bases for Extended Dry Storage of Spent Nuclear Fuel
Technical Bases for Extended Dry Storage of Spent Nuclear Fuel
Independent spent fuel storage installations (ISFSIs) are currently licensed for 20 years. However, delays in developing permanent spent fuel disposal capability require continued ISFSI storage beyond the 20-year term. This report provides a technical basis for demonstrating the feasibility of extended spent fuel storage in ISFSIs.
EBS Radionuclide Transport Abstraction
EBS Radionuclide Transport Abstraction
The purpose of this report is to develop and analyze the Engineered Barrier System (EBS) Radionuclide Transport Abstraction Model, consistent with Level I and Level II model validation, as identified in Technical Work Plan for: Near-Field Environment: Engineered Barrier System: Radionuclide Transport Abstraction Model Report (BSC 2006 [DIRS 177739]). The EBS Radionuclide Transport Abstraction (or RTA) is the conceptual model used in the Total System Performance Assessment (TSPA) to determine the rate of radionuclide releases from the EBS to the unsaturated zone (UZ).
What We've Heard - A Staff Summary of Major Themes in Testimony and Comments Received by the Blue Ribbon Commission on America’s Nuclear Future to Date
What We've Heard - A Staff Summary of Major Themes in Testimony and Comments Received by the Blue Ribbon Commission on America’s Nuclear Future to Date
The Commission is charged with submitting a
draft report to the Secretary of Energy before
the end of July 2011. To aid the Commissioners
in fulfilling that responsibility, the Commission
staff has prepared this report to summarize what
the Commission has heard up to this point in
the process. It does not attempt to recount every
comment or opinion submitted to the Commission
thus far; rather, the aim here is to summarize
major themes from the extensive testimony and
public comment the Commission has received to
Nuclear Waste Facility Siting and Local Opposition
Nuclear Waste Facility Siting and Local Opposition
On the historic evidence, but also for the distinctive qualities of the challenge, nuclear waste siting conflicts are assuredly among the most refractory in the large variety of NIMBY (Not In My Back Yard) facility siting disputes. Since the president brought the Yucca Mountain process to a halt in 2010 (or, more accurately, issued its death certificate), the search for a permanent waste fuel repository is at the starting line again.