Category of Content
Siting Experience Documents Only
Publication Date
Country
Keywords
Program on Technology Innovation: Readiness of Existing and New U.S. Reactors for Mixed-Oxide (MOX) Fuel
Program on Technology Innovation: Readiness of Existing and New U.S. Reactors for Mixed-Oxide (MOX) Fuel
Expanding interest in nuclear power and advanced fuel cycles indicate that use of mixed-oxide (MOX) fuel in the current and new U.S. reactor fleet could become an option for utilities in the coming decades. In light of this renewed interest, EPRI has reviewed the substantial knowledge base on MOX fuel irradiation in light water reactors (LWRs). The goal was to evaluate the technical feasibility of MOX fuel use in the U.S. reactor fleet for both existing and advanced LWR designs (Generation III/III+).
Criticality Analysis of Pu and U Accumulations in a Tuff Fracture Network
Criticality Analysis of Pu and U Accumulations in a Tuff Fracture Network
The objective of this analysis is to evaluate accumulations within the thermally altered tuff surrounding a drift. The evaluation examines accumulation of uranium minerals (soddyite), plutonium oxide (Pu01), and combinations of these materials. A hypothetical model of the tuff is used to provide insight into the factors that affect criticality for this near-field scenario. The factors examined include: the size of the accumulation, the fissile composition of the accumulation, the water or clayey material fraction in the accumulation and the water fraction in the tuff
Korean Third National Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
Korean Third National Report under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management
The government of the Republic of Korea, as a contracting party to the Joint<br/>Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive<br/>Waste Management (hereinafter referred to as “Joint Convention”) which entered into<br/>force on June 18, 2001, and deposited the ratification of on September 16, 2002,<br/>described the state of implementing the contracting party’s obligations in the Third<br/>National Report, pursuant to Article 32 (Reporting) of the Joint Convention.<br/>This National Report was prepared in accordance wi
Korean Second National Report Under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Korean Implementation of the Obligations of the Joint Convention Second Review Meeting
Korean Second National Report Under the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, Korean Implementation of the Obligations of the Joint Convention Second Review Meeting
The Korean government has maintained a consistent national policy for stable energy supply by fostering nuclear power industries under the insufficient energy resources in the country. Nuclear power reached approximately 40 % of total domestic electricity generation. Since the commencement of the first commercial operation of Kori Unit 1 in April 1978, 20 units of NPPs are commercially operating as of October 2005. Four units out of the 20 operating NPPs are Pressurized Heavy Water Reactors (PHWRs) at Wolsong.