DECOMMISSIONING COST ANALYSIS for the CLINTON POWER STATION
DECOMMISSIONING COST ANALYSIS for the CLINTON POWER STATION
<div class="page" title="Page 1">
<div class="section">
<div class="layoutArea">
<div class="column">
<div class="page" title="Page 1">
<div class="section">
<div class="layoutArea">
<div class="column">
<div class="page" title="Page 8">
<div class="layoutArea">
<div class="column">
<div class="page" title="Page 1">
<div class="layoutArea">
<div class="column">
A set of 16 geologic disposal concepts is described in sufficient detail for rough-order-of-magnitude repository cost estimates, for disposal of spent nuclear reactor fuel in generic crystalline, argillaceous, and salt host geologic media. The description includes total length, diameter, and volume for all underground shafts, ramps, drifts and large-diameter borings. Basic types of ground support are specified. Total repository capacity is assumed to be approximately 140,000 MT of spent fuel, but concepts are described in terms of modular panels each containing 10,000 MT.
Greece has signed the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management on 5 September 1997. The Convention entered into force on 16 March 2000. The present report is the National Report of Greece for the Second Review Meeting to the Convention, which will take place 15-26 May 2006 at the IAEA in Vienna. The report has been prepared in accordance with the Guidelines regarding the Form and Structure of National Reports (IINFCIRC/604, 1 July 2002), established by the Contracting Parties under Article 29 of the Convention.