Category of Content
Siting Experience Documents Only
Publication Date
Subject Matter
Keywords
Experimental Investigation of Burnup Credit for Safe Transport, Storage, and Disposal of Spent Nuclear Fuel
Experimental Investigation of Burnup Credit for Safe Transport, Storage, and Disposal of Spent Nuclear Fuel
Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites
Report to Congress on the Demonstration of the Interim Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites
A Statistical Method for Estimating the Net Uncertainty in the Prediction of k Based on Isotopic Uncertainties
A Statistical Method for Estimating the Net Uncertainty in the Prediction of k Based on Isotopic Uncertainties
Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program, Report to the Congress by the Secretary of Energy
Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program, Report to the Congress by the Secretary of Energy
The success of the Civilian Radioactive Waste Management Program of the U.S.
Department of Energy (DOE) is critical to U.S. ability to manage and dispose of
nuclear waste safely--and to the reestablishment of confidence in the nuclear energy
option in the United States. The program must conform with all applicable standards
and, in fact, set the example for a national policy on the safe disposal of radioactive
waste.
The Secretary of Energy has recently completed an extensive review of the
Validation of SCALE-4 for Burnup Credit Applications
Validation of SCALE-4 for Burnup Credit Applications
In the past, criticality analysis of pressurized water reactor (PWR) fuel stored in racks and casks has assumed that the fuel is fresh with the maximum allowable initial enrichment. If credit is allowed for fuel burnup in the design of casks that are used in the transport of spent light water reactor fuel to a repository, the increase in payload can lead to a significant reduction in the cost of transport and a potential reduction in the risk to the public. A portion of the work has been performed at Oak Ridge National Laboratory (ORNL) in support of the U.S.
Internationalization of the Nuclear Fuel Cycle--Goals, Strategies, and Challenges
Internationalization of the Nuclear Fuel Cycle--Goals, Strategies, and Challenges
The so-called nuclear renaissance has increased worldwide interest in nuclear power.
This potential growth also has increased, in some quarters, concern that nonproliferation
considerations are not being given sufficient attention. In particular, since the introduction of
many new power reactors will lead to requiring an increase in uranium enrichment services to
provide the reactor fuel, the proliferation risk of adding enrichment facilities in countries that do
LINE - Leadership in Nuclear Energy Commission - Full Report
LINE - Leadership in Nuclear Energy Commission - Full Report
Recognizing that Idaho has a major strategic and economic interest in maintaining INL’s leadership role and in helping
the nuclear energy industry successfully meet these broader challenges, Idaho governor C.L. “Butch” Otter established
the Leadership in Nuclear Energy or “LINE” Commission in February 2012.
The Governor recognized that recent national developments in the nuclear energy sector will cause the State of Idaho to
face important choices in the future and that he needed to understand the best options available.
Report to the Secretary of Energy on the Conclusions and Recommendations of the Advisory Panel o Alternative Means of Financing and Managing (AMFM) Radioactive Waste Management Facilities
Report to the Secretary of Energy on the Conclusions and Recommendations of the Advisory Panel o Alternative Means of Financing and Managing (AMFM) Radioactive Waste Management Facilities
The AMFM Panel has submitted its report "Managing Nuclear
Waste - A Better Idea" to the Secretary. The report contains six
general conclusions and one general recommendation in Chapter
XII. In addition, Chapter X contains 14 specific enhancements
("Key Components of Any Waste Management Structure") that are
recommended for implementation by the Office of Civilian Radioactive
Waste Management (OCRWM) or any alternative organization.
This paper lists and discusses the 6 general conclusions, the
Federal Policy for the Disposal of Highly Radioactive Wastes from Commercial Nuclear Power Plans, An Historical Analysis
Federal Policy for the Disposal of Highly Radioactive Wastes from Commercial Nuclear Power Plans, An Historical Analysis
How to dispose of highly radioactive wastes from commercial nuclear power plants is a question that has remained unresolved in the face of rapidly changing technological, economic, and political requirements. In the three decades following World War II, two federal agencies--the Atomic Energy Commission and the Energy Research and Development Administration--tried unsuccessfully to develop a satisfactory plan for managing high level wastes.
Consolidated Interim Storage of Commercial Spent Nuclear Fuel-A Technical and Programmatic Assessment
Consolidated Interim Storage of Commercial Spent Nuclear Fuel-A Technical and Programmatic Assessment
Approximately 54,000 tons of spent nuclear fuel are stored at operating nuclear power plants and several decommissioned power plants throughout the country. Spent fuel storage at these sites was never intended to be permanent. The current Federal plan is to place the fuel in a repository for permanent disposal in Nevada at Yucca Mountain.
Environmental Impact Statement, Management of Commercially Generated Radioactive Waste. Volume 1
Environmental Impact Statement, Management of Commercially Generated Radioactive Waste. Volume 1
In the course of producing electrical power in light water reactors (LWRs), the uranium
fuel accumulates fission products until the fission process is no longer efficient.for power
production. At that point the fuel is removed from the reactor and stored in water basins
to allow radioactivity to partially decay before further disposition. This fuel is referred
to as "spent fuel." Although spent fuel as it is discharged from a reactor is intensely
radioactive, it has been stored safely in moderate quantities for decades. Spent fuel could
Report on Radioactive Waste Ownership and Management of Long-Term Liabilities in EDRAM Member Countries
Report on Radioactive Waste Ownership and Management of Long-Term Liabilities in EDRAM Member Countries
This report has been prepared by an ad-hoc Working Group (WG) formed by ANDRA (France), NUMO (Japan), NAGRA (Switzerland) and ENRESA (Spain) in May 2003, after the EDRAM meeting held in Valencia to study the situation in the different EDRAM member countries regarding the treatment of radioactive waste ownership and management of long-term liabilities.
PWR Radiochemical Assay Benchmarks Using SAS2H and CASMO
PWR Radiochemical Assay Benchmarks Using SAS2H and CASMO
Recommendations for PWR Storage and Transportation Casks That Use Burnup Credit
Recommendations for PWR Storage and Transportation Casks That Use Burnup Credit
Regulatory Perspective on Potential Fuel Reconfiguration and Its Implication to High Burnup Spent Fuel Storage and Transportation
Regulatory Perspective on Potential Fuel Reconfiguration and Its Implication to High Burnup Spent Fuel Storage and Transportation
The recent experiments conducted by Argonne National Laboratory on high burnup fuel cladding material property show that the ductile to brittle transition temperature of high burnup fuel cladding is dependent on: (1) cladding material, (2) irradiation conditions, and (3) drying-storage histories (stress at maximum temperature) [1]. The experiment results also show that the ductile to brittle temperature increases as the fuel burnup increases.
The Report to the President and the Congress by the Secretary of Energy on the Need to a Second Repository
The Report to the President and the Congress by the Secretary of Energy on the Need to a Second Repository
The Nuclear Waste Policy Act of 1982, as amended (NWPA), establishes a process for the siting, construction and operation of one or more national repositories for permanent disposal of the Nation’s spent nuclear fuel (SNF) and high-level radioactive waste (HLW). In 1987, after the Department of Energy (the Department or DOE) had conducted studies of nine potential repository sites located throughout the United States, Congress amended the NWPA and selected the Yucca Mountain site in Nye County, Nevada as the only site for further study for the first national repository.
Recommendation by the Secretary of Energy of Candidate Sites for Site Characterization for the First Radioactive-Waste Repository
Recommendation by the Secretary of Energy of Candidate Sites for Site Characterization for the First Radioactive-Waste Repository
The Nuclear Waste Policy Act of 1982 (the Act), established a
step-by-step process for the siting of the nation's first repository for
high-level radioactive waste and spent fuel. The Act gave the Department of
Energy (DOE) the primary responsibility for conducting this siting process.
The first step in the process laid out in the Act was the development by
the DOE, with the concurrence of the Nuclear Regulatory Commission (NRC), of
general guidelines to be used by the Secretary of the DOE (the Secretary) in
Investigation of Average and Pin-Wise Burnup Modeling of PWR Fuel
Investigation of Average and Pin-Wise Burnup Modeling of PWR Fuel
Burnup Credit - Technical Basis for Spent-Fuel Burnup Verification
Burnup Credit - Technical Basis for Spent-Fuel Burnup Verification
Present regulatory practices provide as much burnup credit flexibility as can be currently
expected. Further progress is achievable by incorporating the negative reactivity effects of a
subset of neutron-absorbing fission-product isotopes, and by optimizing the procedural approach
for establishing the burnup characteristics of the spent fuel to be loaded in burnup-creditdesigned
storage and transportation systems. This report describes progress toward developing a
Fission Product Experiment Program: Validation and Calculational Analysis
Fission Product Experiment Program: Validation and Calculational Analysis
From 1998 to 2004, a series of critical experiments referred to as the fission product (FP) experimental program was performed at the Commissariat à l'Energie Atomique Valduc research facility. The experiments were designed by Institut de Radioprotection et de Sûreté Nucléaire (IRSN) and funded by AREVA NC and IRSN within the French program supporting development of a technical basis for burnup credit validation.
Improved Radiochemical Assay Analyses Using TRITON Depletion Sequences in SCALE
Improved Radiochemical Assay Analyses Using TRITON Depletion Sequences in SCALE
A Technology Roadmap for Generation IV Nuclear Energy Systems, Ten Nations Preparing Today for Tomorrow's Energy Needs
A Technology Roadmap for Generation IV Nuclear Energy Systems, Ten Nations Preparing Today for Tomorrow's Energy Needs
The world’s population is expected to expand from
about 6 billion people to 10 billion people by the year
2050, all striving for a better quality of life. As the
Earth’s population grows, so will the demand for energy
and the benefits that it brings: improved standards of
living, better health and longer life expectancy, improved
literacy and opportunity, and many others.
Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants
Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants
The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs).